4817-meter Xujiapo Tunnel on the Kangyu Section of the Xi'an-Chongqing High-Speed Railway in China Breaks Through

2026-11-23 09:00
Favorite

en.Wedoany.com Reported - On November 22, the Xujiapo Tunnel on the Kangyu Section of the Xi'an-Chongqing High-Speed Railway (Xiyu High-Speed Railway) was successfully holed through. With a total length of 4,817 meters, the tunnel is located in Longfengqiao Subdistrict, Beibei District, Chongqing. It is a Class II risk tunnel for the entire line and a key control project within its contract section.

The Xujiapo Tunnel is situated in a low-mountain area with considerable topographic relief and local steep cliffs, with a maximum burial depth of approximately 280 meters. During construction, the tunnel faced risks including low gas, underpassing an expressway, and complex surrounding rock geology, placing high demands on construction organization, safety control, and geological forecasting. The contractor, China Railway 11th Bureau Group, dynamically adjusted construction techniques and optimized work procedures in response to changes in surrounding rock geology, and established a full-process safety and quality control system to resolve construction challenges posed by complex geological conditions and cross-operation near existing roads.

The main line of the Xiyu High-Speed Railway is approximately 739 kilometers long and is being built in two sections: the Xi'an-Ankang Section and the Ankang-Chongqing Section (Kangyu Section). The Kangyu Section has a main line length of approximately 478 kilometers, starting from Ankang West Station in Shaanxi in the north and passing through Shaanxi, Sichuan, and Chongqing before connecting to Chongqing West Station; the supporting Fankuai-via-Kaizhou-to-Wanzhou connecting line is approximately 90 kilometers long, linking Fankuai Station in Sichuan with Kaizhou and Wanzhou North Station in Chongqing.

With the breakthrough of the Xujiapo Tunnel, the Kangyu Section has completed another major and difficult tunnel construction milestone. The project still needs to advance the construction of bridges, tunnels, ballastless track, station buildings, and communication and signaling works, ultimately forming the Xi'an-Chongqing high-speed railway corridor.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com