Czech Škoda Group Completes Delivery of 23 Electric Multiple Units to RegioJet

2026-11-24 09:05
Favorite

en.Wedoany.com Reported - On November 19, Czech Škoda Group delivered the last electric multiple unit to railway operator RegioJet, completing the supply of all 23 regional railway vehicles. These trains will be used for regional rail transport in the Ústí Region of the Czech Republic, consisting of 15 two-car units and 8 three-car units, totaling 54 cars, with a maximum operating speed of 160 km/h.

The delivered vehicles are all equipped with a dual-voltage power supply system, compatible with 3 kV DC and 25 kV, 50 Hz AC electrified lines, and are fitted with the European Train Control System (ETCS). Škoda Group participated in the production, with its Ostrava plant undertaking part of the manufacturing work. The trains feature a low-floor design, suitable for suburban and regional rail transport.

The two-car units are 52.9 meters long and offer 142 seats, including 16 first-class seats; the three-car units are 79.5 meters long and offer 228 seats, including 8 first-class seats. Both vehicle types are equipped with wheelchair spaces and feature air conditioning, Wi-Fi, 230 V power outlets, USB ports, and bicycle and stroller storage areas. The vehicles are also fitted with accessible toilets to meet the travel needs of different passengers.

The procurement contract for these vehicles was announced in May 2024, with a contract value of approximately 133 million euros (converted at approximately 7.8 yuan per euro, equivalent to approximately 1.04 billion yuan). The project serves a 15-year operating arrangement for regional rail in the Ústí Region, with an expected annual transport task of approximately 3.3 million train-kilometers. RegioJet will use these vehicles to operate local regional lines U1, U3, U32, U51, and U54.

The first trains entered passenger service on July 1, 2026. With the delivery of the last vehicle completed, RegioJet plans to put all 23 multiple units into operation on December 13, 2026, when the new timetable is implemented. By then, the new fleet will handle passenger transport tasks on multiple local regional rail lines.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com