First infill well at Masirah Oil's Yumna field in Oman reaches target depth

2026-11-24 11:05
Favorite

en.Wedoany.com Reported - On November 23, Masirah Oil, an offshore oil and gas operator in Oman, announced that the first well of the current infill drilling campaign at the Yumna field in Block 50 offshore Oman has reached target depth, and drilling operations will move to the second well. The first oil production from the new wells, originally planned for November 2026, will be delayed. The company spudded the first well of this campaign on October 21 and has not yet entered the production phase for the new wells.

Masirah Oil is an indirect subsidiary 87.5% owned by Jasmine Energy, serves as the operator of Block 50 in Oman, and holds a 100% interest in the block. Block 50 is located in the Masirah Bay area offshore eastern Oman, covering an area of approximately 17,000 square kilometers. The Yumna field achieved first oil in February 2020.

The current drilling campaign was previously arranged under a drilling services agreement among Arabian Drilling, Masirah Oil, and Northern Offshore, covering two firm wells and two optional wells. In 2024, the Yumna field completed a multi-well drilling program, with the Yumna-5 well brought into production in April of that year.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com