Rated capacity (kVA) |
Voltage combination and tap range |
Bonding Group Label |
Level 1 Energy Efficiency |
Level 2 Energy Efficiency |
Level 3 Energy Efficiency |
Short circuit impedance (%) |
|||||
|
High voltage (kV) |
High voltage tap range (%) |
Low voltage (kV) |
No-load loss (kW) |
Load loss (kW) |
No-load loss (kW) |
Load loss (kW) |
No-load loss (kW) |
Load loss (kW) |
|||
|
30 |
6 6.3 10 10.513.8 |
± 5% or ± 2 × 2.5% |
0.4 0.433 0.48 0.57 0.69 |
Dyn11/Yyn0 |
0.065 |
0.455/0.43 |
0.07 |
0.505/0.48 |
0.08 |
0.63/0.60 |
4 |
|
50 |
0.08 |
0.655/0.625 |
0.09 |
0.73/0.695 |
0.1 |
0.91/0.87 |
|||||
|
100 |
0.12 |
1.14/1.08 |
0.135 |
1.265/1.20 |
0.15 |
1.58/1.50 |
|||||
|
160 |
0.16 |
1.665/1.585 |
0.18 |
1.85/1.76 |
0.2 |
2.31/2.20 |
|||||
|
200 |
0.19 |
1.97/1.87 |
0.215 |
2.185/2.08 |
0.24 |
2.73/2.60 |
|||||
|
315 |
0.27 |
2.76/2.63 |
0.305 |
3.065/2.92 |
0.34 |
3.83/3.65 |
|||||
|
400 |
0.33 |
3.25/3.095 |
0.37 |
3.615/3.44 |
0.41 |
4.52/4.3 |
|||||
|
500 |
0.385 |
3.90/3.71 |
0.43 |
4.33/4.12 |
0.48 |
5.41/5.15 |
|||||
|
630 |
Dyn11/Yyn0 |
0.46 |
4.46 |
0.51 |
4.96 |
0.57 |
6.2 |
4.5 or 6 |
|||
|
800 |
0.56 |
5.4 |
0.63 |
6 |
0.7 |
7.5 |
|||||
|
1000 |
0.665 |
7.415 |
0.745 |
8.24 |
0.83 |
10.3 |
|||||
|
1250 |
0.78 |
8.64 |
0.87 |
9.6 |
0.97 |
12 |
|||||
|
200 |
± 4 × 2.5%±2 × 2.5% |
0.243 |
2.755 |
0.27 |
2.9 |
0.3 |
2.9 |
4 |
|||
|
315 |
0.34 |
3.895 |
0.38 |
4.1 |
0.42 |
4.1 |
|||||
|
400 |
0.41 |
4.703 |
0.46 |
4.95 |
0.51 |
4.95 |
|||||
|
630 |
0.614 |
6.897 |
0.69 |
7.26 |
0.76 |
7.26 |
4.5 or 6 |
||||
|
800 |
0.71 |
8.45 |
0.8 |
8.89 |
0.89 |
8.89 |
|||||
|
Note: 1. Transformers with special performance parameters can be manufactured according to requirements; 2. For transformers with capacity ≤ 500kVA, the load loss value above the diagonal line in the table is applicable to Dyn11, and the value below the diagonal line is applicable to Yyn0; 3. For non-excitation voltage regulating transformer, the no-load current value above the oblique line in the table is the standard value of GB/T 6451-2015, and the value below the oblique line is the value required by the special technical specification of the national grid procurement standard. |
|||||||||||