|
Condensing Steam Turbine |
|||||
|
Model |
Power MW |
Speed |
Inlet parameters |
||
|
Rated r/min |
Pressure MPa |
Temperature ℃ |
Maximum steam volume t/h |
||
|
N3~N4.5 |
3~4.5 |
3000 |
2.35~3.43 |
390~450 |
20~23 |
|
N6~N7.5 |
6~7.5 |
3000 |
2.35~4.90 |
390~470 |
30~45 |
|
N9~N10 |
9~10 |
3000 |
3.43~4.90 |
435~470 |
48~58 |
|
N12~N15 |
12~15 |
3000 |
3.43~8.83 |
435~535 |
48~82 |
|
N12~N15 (air cooling) |
12~15 |
3000 |
3.43~8.83 |
435~535 |
50~85 |
|
N18~N20 |
18~20 |
3000 |
3.43~8.83 |
435~535 |
62~85 |
|
N18~N20 (air cooling) |
18~20 |
3000 |
3.43~8.83 |
435~535 |
73~90 |
|
N25~N30 |
25~30 |
3000 |
3.43~8.83 |
435~535 |
120~150 |
|
N25~N30 (air cooling) |
25~30 |
3000 |
3.43~8.83 |
435~535 |
125~160 |
|
N50~N60 |
50~60 |
3000 |
3.43~8.83 |
435~535 |
210~280 |
|
N50~N60 (air cooling) |
50~60 |
3000 |
3.43~8.83 |
435~535 |
220~290 |
1/1
Condensing Steam Turbine
Negotiable
China
No. 7 Wuyang Road, Shibei District, Qingdao City, Shandong Province
+86 0532-86125168
287559795@qq.com
Product Parameters
Other products from this supplier
Negotiable
High-efficiency Extraction Back-pressure Steam Turbine
Negotiable
High-efficiency Back-pressure Steam Turbine
Negotiable
Fifth-generation High-efficiency Reaction Steam Turbine
Negotiable
Variable-frequency Steam-electric Dual-drive Steam Turbine
Negotiable
Quick-installation Small Steam Turbine
Negotiable
Generator
Negotiable
Driven - Extraction Condensing Steam Turbine
Negotiable
Driven - Condensing Steam Turbine
Negotiable
Driven - Back-pressure Steam Turbine
Negotiable
Back-pressure Steam Turbine
Negotiable
Extraction Condensing Steam Turbine
Negotiable
Double Extraction Condensing Steam Turbine
Related Products
Malaysia EMPP Gas Power Plant
Negotiable
0.66kV Power Supply Instrument Transformer
Negotiable
MESS8201-2507/5015-BN Prefabricated Liquid-cooled Energy Storage Battery Container
Negotiable
CITIC Heavy Industries Offshore Wind Power Equipment Hydraulic Pile Hammer
Negotiable
Mars (Liquid Cooling) Series Industrial and Commercial Energy Storage Converter High Protection Module
Negotiable
Intelligent SF₆ Ring Main Unit
Negotiable
Yingping Mining Section Open-pit Tailings Backfill Treatment of Goaf Ecological Restoration EPC Project
Negotiable
Oil-immersed Amorphous Alloy Core Distribution Transformer
Negotiable
Pressure Vessels
Negotiable
Double-slide Triple-sealed Hot Air Isolation Door
Negotiable
N-type TOPCon monocrystalline cells 182-16BB
Negotiable
Integrated Photovoltaic Energy Storage System
Negotiable
