Product Introduction
Our company's independently developed new arch-anchor-grouting combined operation trolley integrates arch erection, anchor drilling, and grout mixing/injection functions. The equipment can complete the three processes of arch erection, anchor installation, and grouting simultaneously without requiring withdrawal from the working face, improving work efficiency by more than 50% compared to traditional methods, significantly reducing the number of construction personnel, and greatly enhancing safety indices.
Applicable scope: Suitable for various operation modes including three-bench, double-bench, micro-bench, and full-section methods;
Three major processes: Arch erection, anchor installation, and grouting;
Nine major functions: Under-excavation treatment, charging, arch erection, anchor mesh welding, foot-lock anchors, systematic anchors, advanced pipe shed/conduits, high-pressure grouting, and prestress application.
Structural Features
Integrated rigid engineering chassis, four-wheel drive, bidirectional driving design, electric-powered operation, diesel-powered emergency backup. All three arms feature rotary folding + telescopic structures, with a significantly larger working radius for the side arms compared to other products. The three-arm, three-gripper structure is equipped with a dual-anchor high-power rock drilling system, achieving a maximum drilling depth of 4.1m and accommodating 4.5m drill rods. The single-arm maximum lifting capacity is 3t, and the grout mixing/injection capacity reaches 4 cubic meters per hour.
Key Advantages
1. Green: Low energy consumption, zero emissions;
2. Efficient: Only two operators and one assistant are required for the machine. No vehicle repositioning is needed during the construction process, saving 2 hours of conversion time per cycle. Arch erection takes only 50 minutes. The left and right drills can simultaneously perform foot-lock anchor and systematic anchor hole operations. Equipped with high-power hydraulic rock drills with a maximum power of 2×18kW and a drilling speed of 2m/min. The high-capacity grout pump delivers 4m³/h with dual-channel grouting, doubling efficiency. The arch erection arm is also fitted with dual hydraulic breakers for under-excavation treatment and hazard removal.
3. Intelligent: Remote control with automatic data collection and upload;
4. Safe: Prefabricated steel mesh protection is provided above during arch erection and anchor hole drilling, reducing the number of workers at the tunnel face by approximately 70%.