Q/GM312A Arch-Anchor-Grouting Combined Operation Trolley

Negotiable
China
Luoyang Circular Economy Industrial Park, Henan Province
0379-67851100
+86 9599 3314
Online Contact
Favorite

Product Introduction

Product Introduction

Our company's independently developed new arch-anchor-grouting combined operation trolley integrates arch erection, anchor drilling, and grout mixing/injection functions. The equipment can complete the three processes of arch erection, anchor installation, and grouting simultaneously without requiring withdrawal from the working face, improving work efficiency by more than 50% compared to traditional methods, significantly reducing the number of construction personnel, and greatly enhancing safety indices.

Applicable scope: Suitable for various operation modes including three-bench, double-bench, micro-bench, and full-section methods;

Three major processes: Arch erection, anchor installation, and grouting;

Nine major functions: Under-excavation treatment, charging, arch erection, anchor mesh welding, foot-lock anchors, systematic anchors, advanced pipe shed/conduits, high-pressure grouting, and prestress application.

Structural Features

Integrated rigid engineering chassis, four-wheel drive, bidirectional driving design, electric-powered operation, diesel-powered emergency backup. All three arms feature rotary folding + telescopic structures, with a significantly larger working radius for the side arms compared to other products. The three-arm, three-gripper structure is equipped with a dual-anchor high-power rock drilling system, achieving a maximum drilling depth of 4.1m and accommodating 4.5m drill rods. The single-arm maximum lifting capacity is 3t, and the grout mixing/injection capacity reaches 4 cubic meters per hour.

Key Advantages

1. Green: Low energy consumption, zero emissions;

2. Efficient: Only two operators and one assistant are required for the machine. No vehicle repositioning is needed during the construction process, saving 2 hours of conversion time per cycle. Arch erection takes only 50 minutes. The left and right drills can simultaneously perform foot-lock anchor and systematic anchor hole operations. Equipped with high-power hydraulic rock drills with a maximum power of 2×18kW and a drilling speed of 2m/min. The high-capacity grout pump delivers 4m³/h with dual-channel grouting, doubling efficiency. The arch erection arm is also fitted with dual hydraulic breakers for under-excavation treatment and hazard removal.

3. Intelligent: Remote control with automatic data collection and upload;

4. Safe: Prefabricated steel mesh protection is provided above during arch erection and anchor hole drilling, reducing the number of workers at the tunnel face by approximately 70%.

Product Parameters

Q/GM312A Arch-Anchor-Grouting Combined Operation Trolley Parameter Table

No.

Item

Parameter

Remarks

1

Total machine weight

41800kg

Overall machine parameters

2

Overall dimensions (L×W×H)

10450×3580×3300mm

3

Maximum working range (W×H)

18000×12000mm

4

Minimum working range (W×H)

5800×4700mm

5

Cable length

50m

6

Total installed power

129kW

7

Engine (China Stage IV)

155kW

 

Travelling system

8

Travelling mode

Four-wheel drive, bidirectional driving

9

Minimum turning radius

13m

10

Maximum travelling speed

20km/h

11

Minimum ground clearance

350mm

12

Approach angle/Departure angle

22°/22°

13

Maximum gradeability

40%

14

Rock drill power

22kW

Anchor system

15

Number of rock drills

2 units

16

Drilling diameter

41-110mm

17

Maximum single drilling depth

4.5m

18

Maximum drilling speed

2m/min

19

Maximum drilling depth

25m

20

Number of booms

3 units

Arch erection system

21

Main boom maximum lifting capacity

3000kg

22

Side boom maximum lifting capacity

2000kg

23

Main boom lifting speed

0.47m/s

24

Side boom lifting speed

0.5m/s

25

Number of work baskets

2 units

26

Work basket maximum load capacity

300kg

27

Number of hydraulic breakers

2 units

28

Maximum grout mixing capacity

4m³/h

Grouting system

29

Maximum grouting capacity

4m³/h

30

Maximum grouting pressure

2.5MPa