Akselos and Sener Collaborate on Floating Offshore Wind Foundation
2025-01-02 09:00
Favorite
Wedoany.com Report-Jan 02,Akselos has announced its collaboration with the engineering and technology group Sener on the DECIMAP project. This partnership aims to redefine the design and optimisation of the HiveWind floating offshore wind platform.
Akselos will provide its Reduced Basis Finite Element Analysis (RB-FEA) technology to conduct detailed fatigue and strength analyses for the HiveWind floating platform. The main goal of DECIMAP, a project led by Sener, is to develop a new floating foundation for offshore wind turbines. HiveWind is a semi-submersible floating steel platform developed by Sener in collaboration with WindWaves.
Related Products
Negotiable /Set
Ultrasonic Wind Speed and Direction Instrument
Kingmach Measurement & Monitoring Technology Co., Ltd.
Negotiable
CITIC Heavy Industries Offshore Wind Power Equipment Hydraulic Pile Hammer
CITIC Heavy Industries Co., Ltd.
Negotiable
"Shunyi 1600" Deep-submerging Bottom-sitting Multi-functional Wind Power Engineering Vessel
Zhengli Offshore Engineering Co., Ltd.
Negotiable /Set
Wind Power Tower Mold
Qinhuangdao Tianye Tolian Heavy Industry & Technology Co., Ltd.
Negotiable
Pressurized Drilling Vertical Boring Machine
CCCC Tianhe Mechanical Equipment Manufacturing Co., Ltd.
Related Recommendations

Spain's AEE and IIC Jointly Establish Wind Power Artificial Intelligence Laboratory
2026-05-26

China's Dajin Heavy Industry signs contract with Dutch Jumbo to build two heavy-lift vessels, delivery in Q3 2028
2026-05-26

TotalEnergies Plans to Sell 50% Stake in 1.2 GW of Solar and Wind Assets in Europe
2026-05-23

Danish Offshore Wind Developer's 583 MW Greater Changhua 4 Project in Taiwan Achieves Full Grid Connection for All Turbines
2026-05-23

AirPlus Renewables Plans to Deploy XEVA Turbines in the UK This Year
2026-05-23

Canary Islands Government and El Hierro Council Sign Agreement to Designate 740 Hectares as Renewable Energy Acceleration Zones
2026-05-22

Max Bögl Wind AG Sets World Record with 199-Meter Hub Height Onshore Wind Turbine in Germany
2026-05-22

Spain's Gonvarri Signs 10-Year Renewable Energy PPA with Iberdrola
2026-05-22

RWE Starts Construction of 42 MW Serra Giannina Onshore Wind Farm in Italy
2026-05-22

Italy's Tozzi Green Launches 45MW San Pancrazio Salentino Wind Farm
2026-05-22
Lastest Bulletin
1
Smart Electrical Assemblies Depend on Condition Monitoring and Fault Early Warning
2
Smart Electrical Assemblies Depend on Condition Monitoring and Fault Early Warning
3
Wire and Cable Equipment Intelligence Depends on Full-Process Quality Traceability
4
Wire and Cable Equipment Is Becoming Critical as Global Grid Expansion Accelerates
5
Power Facility Operation and Maintenance Is Moving from Periodic Repair to Condition-Based Management
6
Power Facility Operation and Maintenance Is Moving from Periodic Repair to Condition Awareness
7
Relay Protection Automation Maintenance Must Move Toward Condition-Based Management
8
Relay Protection Automation Upgrades Depend on Communication Reliability and Data Trustworthiness
9
Renewable Integration Is Reshaping the Configuration Logic of Relay Protection Automation
10
Relay Protection Automation Is Becoming an Intelligent Safety Barrier for Modern Power Grids