China Completes Drilling of Asia’s Deepest Vertical Well
2025-02-20 16:39
Favorite

Staff members pose for a group photo as they celebrate the completion of the drilling of "Shenditake 1," an ultra-deep borehole reaching 10,910 meters, in the hinterland of the Taklimakan Desert in the Tarim Basin, northwest China's Xinjiang Uygur Autonomous Region, Feb. 20, 2025.
Wedoany.com Report-Feb 20, China National Petroleum Corporation announced Thursday that it has completed the drilling of the deepest vertical well in Asia, as a borehole reached a depth of 10,910 meters in China's northwestern desert.
This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com
Related Products

Negotiable
Petroleum Drilling Rig, Mud Pump Industry Related Forgings Mud Pump High-Pressure, Low-Pressure Liquid Cylinder, Drilling Rig Gear Shaft, Gear Ring, Crankshaft
Iraeta Energy Equipment Co., Ltd.




Negotiable
YBX3 Series (Frame Number 355-630) High-Efficiency Explosion-Proof Three-Phase Asynchronous Motor
Jiamusi Electric Machine Co., Ltd.



Negotiable
Surface-Driven Screw Pump Oil Production System
Shandong Weima Pumps Manufacturing Co., Ltd.
Negotiable
Fully gravity-balanced oil, gas, and water treatment integrated system-Intelligent pulse water separation integrated system
Sino Science and Technology Co.,Ltd.
Negotiable /PCS/sample
2.7V 100000F (60wh) 60138 high-power energy storage power starting power supply (instantaneous high current), low-temperature discharge, long service life, 100000 times of use
Gonghe Power Co.,LTD Related Reading

Hankook's Tennessee Plant Truck Tire Capacity Utilization Reaches 30%
2026-08-22

Australia's Beetaloo Basin Set to Sell First Shale Gas in September
2026-08-22

nVert Completes RapidGraphite Acquisition, Launches Battery-Grade Graphite Scale-Up Trials
2026-08-22

Electra Battery and Glencore Renew Cobalt Feedstock Supply Agreement Through 2031
2026-08-22

Port of Antwerp-Bruges to Commission First 500 kW AEM Electrolyzer in September
2026-08-22

Germany's SuedLink Tunnel Completed, 4 GW Capacity to Go Live in 2028
2026-08-22

U.S. Community Solar Capacity Reaches 11 GW Across 43 States
2026-08-22

India's AMPIN Energy Secures $195 Million Financing for 100 MW Solar-Wind-Storage Project
2026-08-22

Argentina's Catamarca Approves CAMYEN Restructuring on August 20, Advancing the Tres Quebradas Lithium Project with $709 Million
2026-08-22

UAE scrap steel prices edge up, up AED 14/tonne week-on-week
2026-08-22
Related Video
How China is responding to the energy crisis
00:01:40
Liebherr T284 Mining Truck USA #liebherr #truck #miningtruck #machine
00:01:01
Working Principle of Steam Turbine #fyp #trending #reels #trending #satisfying
00:00:48
CNC Machining#cuttingtools #cnctools #turing #cncmachining #cnc
00:02:47
Reducer, reducer accessories, pellet machine accessories#tiktok #pellet #reducer
00:00:42