France's Court of Accounts Warns of Financing Risks in €84 Billion Nuclear Power Construction Plan

2026-11-17 09:05
Favorite

en.Wedoany.com Reported - On November 16, France's Court of Accounts published a special report titled "State Support Measures for National Energy Production," noting that the six EPR2 nuclear reactors planned by Électricité de France (EDF) face financing pressure from falling electricity prices. The planned construction cost is approximately €84 billion at 2025 prices. The Court of Accounts estimates that when wholesale electricity prices fall below €70 per megawatt-hour, EDF's funding needs will increase significantly, potentially requiring additional support from the French government.

France's new nuclear power program includes an initial batch of six EPR2 reactors, with construction costs of €72.8 billion at 2020 prices, equivalent to approximately €84 billion at 2025 prices. According to France's third multi-year energy plan, the first units are scheduled to enter operation as early as 2038. The French government intends to support construction through preferential loans covering up to 60% of construction costs, and plans to implement a 40-year contract-for-difference mechanism after the units enter operation.

The Court of Accounts noted that under unfavorable electricity price scenarios, the French government may need to forgo collecting cash dividends from EDF during the EPR2 construction period. Some scenario estimates show that cumulative forgone dividends from 2026 to 2040 could reach €65 billion. The budget impact of the new nuclear contract-for-difference is expected to materialize as early as 2038 after the first units enter operation, while fiscal expenditure on interest subsidies for preferential loans is expected to begin in 2027.

According to the financing estimates presented by the Court of Accounts, if the EPR2 construction loan balance reaches €50 billion in 2035 and the average cost of related funds is 3%, annual fiscal expenditure on loan interest subsidies could reach €1.5 billion at that time. Actual expenditure will depend on construction progress, loan drawdown levels, and financing costs.

The report also noted that extending the operating life of existing nuclear units remains France's lower-cost low-carbon electricity supply option. According to data provided by EDF, under conditions of obtaining nuclear safety authorization and controlling maintenance costs, extending the operating life of existing units to 60 years corresponds to a complete generation cost of less than €51 per megawatt-hour at 2023 prices.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com