SPIC Yining West District Integrated Smart Energy Project Phase I 3x130t/h Circulating Fluidized Bed Boiler

EXW
$443,557.33-1,478,524.43 /Set
China
No. 1, Hanan 8th Avenue, Pingfang District, Harbin City
0451-82199801
Online Contact
Favorite
Product Introduction

The 3x130t/h high-temperature high-pressure circulating fluidized bed boilers designed by our company for the Phase I project of Yining West District Integrated Smart Energy Project, when limestone is put into the furnace and no tail semi-dry desulfurization is used, the measured SO₂ emission concentration is lower than 35mg/m³. When the boiler is put into operation with SNCR, NOx reaches ultra-low emission.