Product Introduction

Construction Process Primary Equipment Selection Core Functions and Application Advantages
Advance Support / Excavation Three-Boom Drilling Jumbo / Multi-Function Drilling Rig

Precise drilling (with overbreak/underbreak data feedback), equipped with advance drilling and advance support capabilities . Enclosed cabin keeps operators away from the tunnel face, ensuring high safety and reduced manpower requirements .

Bolting and Shotcreting Support Wet Shotcrete Manipulator Long-distance wireless remote-controlled high-efficiency shotcrete application, significantly reducing rebound rate and dust hazards, ensuring personnel safety.
Invert Works Hydraulic Self-Propelled Invert Bridge

Resolves cross-operation interference. Muck trucks pass normally on the bridge, while rebar tying and invert filling proceed simultaneously underneath . Integrated side drain/curved formwork, equipped with self-propelled hydraulic travel .

Waterproofing and Drainage Waterproof Membrane Work Trolley Provides an elevated working platform, mechanized assistance for membrane laying and positioning welding, improving the flatness of the waterproofing layer.
Secondary Lining Automatic Pouring Secondary Lining Trolley

Achieves high-precision full-section/partial-section lining concrete pouring, overcoming traditional blind-zone defects and enhancing lining compactness and surface quality .

 

II. Detailed Description of Core Flagship Equipment 

1. Fully Computerized/Hydraulic Three-Boom Drilling Jumbo

  • Features: Integrates automated positioning, precise hole layout, and data acquisition .
  • Advantages: Excavation personnel no longer need to stand in hazardous areas at the tunnel face ; automated drilling controls overbreak/underbreak, significantly reducing subsequent shotcrete repair and re-spraying costs ; reduces labor requirements and improves advance rate efficiency .

2. Hydraulic Self-Propelled Invert Bridge

  • Features: Center drainage ditch formwork, invert curved formwork, and the bridge are integrated into a single unit .
  • Advantages: Breaks through the bottlenecks of traditional simple towed bridges, namely low efficiency and high interference . Enables three-dimensional overlapping operations—"busy traffic on the bridge (muck hauling/material transport), bustling activity beneath (rebar tying/pouring)"—significantly shortening cycle times .

3. Intelligent Automatic Pouring Secondary Lining Trolley

  • Features: Equipped with a multi-window automatic layered pouring system, high-frequency attached vibrators, and end-head bulkhead formwork.

  • Advantages: Effectively resolves common defects of traditional secondary lining, such as crown voiding, cavities, crystallization, and water leakage , enhancing the overall durability of the tunnel lining structure.

 

III. Core Value of the Complete Equipment Suite 

Replacing manpower with mechanization, reducing personnel with automation: Frees workers from the tunnel face with its high dust, high noise, and rockfall/collapse hazards, significantly improving construction safety .

Seamless process integration: Through standardized and automated equipment matching, resolves the pain point of cross-process interference, enabling continuous, uninterrupted tunnel flow operations .

Digitalization and quality traceability: Equipment collects construction parameters in real time, including excavation advance, grouting volume, and lining thickness, providing precise data support and full-process quality traceability on site .