Shipbuilding Gantry Crane

Negotiable
China
No. 17 Yongyang Road, Liuyang Economic and Technological Development Zone, Changsha, Hunan Province
0731-82728402
Online Contact
Favorite

Product Introduction

The shipbuilding gantry crane is the core equipment for hull block lifting and grand block assembly operations. It features super-large tonnage load capacity and precise positioning accuracy. Through the coordinated operation of upper and lower trolleys, it achieves the lifting of extra-large components and hull block turning. It is an indispensable core lifting device for large shipyards. The equipment travels along dock rails via a dual-rail synchronous traveling mechanism, adapting to lifting tasks at different workstations. Some models are equipped with basic anti-sway devices and load monitoring systems to enhance operational safety.

Product Advantages

1. Multi-point balance control technology

Eliminates deformation during large block lifting

2. Precision motion control

Three-coordinate positioning system and anti-sway algorithm suppress load swing

3. Intelligent operation capability

Visual positioning system improves positioning accuracy

4. Anti-collision system

LiDAR + millimeter-wave radar 3D monitoring for early warning and braking

5. Dynamic wind load compensation

Improves gantry crane wind resistance

6. Green technology

Supercapacitor recovers 30% of braking energy

Application Scenarios

Shipbuilding gantry cranes are mainly used in shipyards, docks, slipways, and other locations for hull block lifting and turning. They use steel wheels for travel and can be powered by 380V~10KV.

Optional Configurations

1. Intelligent systems: Optional cloud monitoring, video surveillance, remote control, condition monitoring, intelligent lightning protection system, automatic fire extinguishing

2. Energy-saving systems: Energy feedback system, energy recovery system

Product Parameters

Parameter Name

Recommended Values

Rated lifting capacity (t)

Upper trolley main hoist

Below hook

50*2, 60*2, 75*2, 100*2, 125*2, 2x150, 2x200, 2x300, 2x400, 2x500

Lower trolley main hoist

Below hook

60, 75, 100, 150, 200, 250, 300, 400, 500

Lower trolley auxiliary hoist

Below hook

10, 20, 3, 50, 75

Lifting capacity (t)

Two-trolley tandem lift

100, 120, 150, 200, 250, 300, 400,, 500, 600, 800, 1000

Block turning

100, 120, 150, 200, 250, 300, 400,, 500, 600, 800, 1000

Gantry rail span (m)

50, 55, 60, 70, 80, 90, 100, 120, 150, 180

Lifting height (m)

30, 40, 50, 60, 75, 85

Hoisting speed (m/min)

Upper trolley main hoist

Full load

1-10

No load

2-20

Lower trolley main hoist

Full load

1-10

No load

2-20

Lower trolley auxiliary hoist

Full load

10-30

No load

10-50

Trolley speed (m/min)

Upper trolley travel

Full load

25-40

Lower trolley travel

Full load

25-40

Gantry travel speed (m/min)

Full load

20-30