en.Wedoany.com Reported - Tianyao Energy's "Solar-Storage-Charging-Swapping" Green Power Direct Connection project has recently been completed and put into operation. The project is equipped with 4.5 MW of photovoltaic capacity and 3,000 kWh of energy storage equipment, along with a smart heavy-duty truck battery swapping station and high-power charging piles. It can serve 180 heavy-duty truck charging and swapping trips per day, with an annual photovoltaic power generation of 8 million kWh, reducing carbon dioxide emissions by approximately 6.28 million kg per year.

Located at the National Railway Dianshigou Station, the project adopts an on-site green power consumption model, fully adapting to the needs of railway trunk line transshipment and heavy-duty truck short-haul replenishment. It breaks free from the constraints of traditional public grid power supply, helping to reduce operational electricity costs and improve freight turnover efficiency, achieving a simultaneous enhancement of green and low-carbon development and industrial operational benefits. Tianyao Energy stated that it will deeply implement the national "dual carbon" development strategy, carry out the work deployment of the autonomous region party committee's "1571" plan, focus on optimizing the regional energy structure and the green transformation of the logistics industry, continue to deepen the comprehensive green energy field, promote the development of multimodal transport and new energy logistics industry clusters, and contribute the strength of state-owned enterprises to the construction of the local national logistics hub for production services.
This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com









