Our company is responsible for the heavy equipment lifting and transportation works for 25 units of the Phase I works of the Sinopec-Kuwait Integrated Refining and Petrochemical Project. The contract scope covers four major scopes of work: (1) Lifting of heavy equipment of 80 tons or above or 60 meters or above, with a total of 473 units of equipment to be lifted and a total lifting tonnage of 75,589 tons; (2) Transportation of heavy equipment of 80 tons or above or 60 meters or above (from the jetty to the site), with a total of 163 units of equipment to be transported and a total transportation tonnage of 44,596 tons; (3) Ground improvement works for heavy lift and transportation roads and sites throughout the plant; (4) Owner's representative management, providing professional management and technical guidance for lifting operations throughout the plant.
To date, a cumulative total of 142 units/41,437 tons of equipment transportation has been completed, accounting for 87.1% of the total contract quantity and 92.9% of the total weight; a cumulative total of 409 units/68,071 tons of equipment lifting has been completed, accounting for 86.5% of the total contract quantity and 90.1% of the total weight; approximately 185,000 cubic meters of ground improvement for heavy transportation roads and lifting sites has been completed, accounting for 97% of the estimated total; overall construction progress has reached 92%.
The heavy equipment lifting and transportation works of the project are currently scheduled for completion on December 31, 2019.