Daniels MPV2 Project in Canada Completes 615 kW Community Solar PV System
2026-08-14 14:18
Favorite

en.Wedoany.com Reported - The Daniels Corporation, in partnership with AltCrest Energy and Otter Energy Inc., has completed a 615-kilowatt (kW) DC community-scale solar photovoltaic system at the Daniels MPV2 project in Brampton, Ontario, providing on-site clean electricity to an all-electric, net-zero condominium townhouse community in the area.

Once operational, the project will generate clean electricity on-site for the community and deliver long-term electricity cost savings. The solar PV system operates under an Energy-as-a-Service model, owned by AltCrest Energy, with Otter Energy Inc. serving as the engineering, design, and construction partner responsible for system delivery.

MPV2 is the first phase of Daniels' 19-acre low-carbon master-planned community, located at the intersection of Bovaird Drive West and Mississauga Road.

The townhouse development consists of six back-to-back stacked townhouse buildings and one stacked townhouse building. Each building features copper-toned panels that visually echo the mid-rise condominium buildings within the community.

The west tower rises 11 storeys and the east tower rises 14 storeys, with the two towers connected by a single-storey pavilion that serves as a central meeting space. The pavilion provides direct access to shared indoor and outdoor amenities and elevators, and connects to the outdoor pedestrian walkways throughout the community.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com