520 Million! Nanjing Metro Communication and Signaling System Equipment Renewal Project Bidding Concluded
2026-02-09 10:37
Favorite

Bid Opening Record for the Signaling System Equipment Procurement of the Nanjing Metro Line 2 Communication and Signaling System Equipment Renewal Project

Bidder Name: Shanghai Electric Group Transportation Automation System Co., Ltd.

Bid Price: 523,288,988

Bidder Name: CASCO Signal Co., Ltd.

Bid Price: 524,298,844

Bidder Name: Traffic Control Technology Co., Ltd.

Bid Price: 525,000,000

Bidder Name: Zhejiang United Technology Co., Ltd.

Bid Price: 524,701,771

Bidder Name: Siemens Transportation Technology (Beijing) Co., Ltd.; Guangzhou Jiadu Zhitong Technology Co., Ltd.

Bid Price: 523,605,666

Bidder Name: Nanjing Enruite Industrial Co., Ltd.; Nanjing Ruixing Digital Intelligent Metro Co., Ltd.

Bid Price: 522,981,212

Bidder Name: CRSC Urban Rail Transit Technology Co., Ltd.; Nanjing Rail Transit Equipment Technology Co., Ltd.

Bid Price: 519,279,990.05

Scope: Equipment bidding (system equipment integration bidding) for the renewal and renovation of the signaling system equipment for Nanjing Metro Line 2 (Youfangqiao Station ~ Maqun Station, including the Zhujiang Road Control Center, Youfangqiao Depot, Maqun Depot), Line 2 East Extension (Jinmalu Station ~ Jingtianlu Station), and Line 2 West Extension (Luotanglu Station ~ Yuzui Station, including Yuzui Depot).

Details: The signaling system will be renewed and renovated using a Communication-Based Train Control (CBTC) system; The mainline ATP/ATO and CI will be centrally deployed at the control center for renewal and renovation using a self-controllable server hardware solution; The ATP/ATO and CI for depots and parking lots will be locally deployed for renewal and renovation using a self-controllable server hardware solution; A DCC centralized control system will be established for depots and parking lots; The data communication DCS backbone network will be independently reconfigured; The train-to-ground wireless communication will be renewed and renovated using an integrated bearer solution; A two-level degraded backup system consisting of point-type ATP/ATO and interlocking will be set up for the mainline renewal and renovation, and an interlocking degraded mode will be configured for depots and parking lots; The full electronic execution units will be configured for the interlocking system across the entire line; The signal maintenance and monitoring subsystem will be configured according to the Nanjing Metro network intelligent operation and maintenance architecture; The information network security of the signaling system will be upgraded according to the third-level security protection requirements.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com