| Notice Type | Tender Announcement | ||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Notice Number | 137923-2026 | ||||||||||||||||||||||||||||||||||||||||||||||||||
| Description |
Procuring Entity Information:
Procurement Agent Information:
Tender Project Core Information:
Lot Details:
Common Information for All Lots:
Key Milestones:
Qualification Requirements (Strict):
Evaluation Criteria:
Financial and Contract Conditions: Bid Security: Not required (Jelen eljárás nem kötött ajánlati biztosíték nyújtásához) Payment Currency: HUF (Hungarian Forint) Advance Payment: Not provided Payment Method: After delivery and acceptance, issue one invoice based on acceptance certificate, payment via bank transfer. Late Delivery Penalty: 1% of net purchase price per day, maximum not exceeding 20% Breach of Contract Compensation: If the contract cannot be fulfilled due to the winning bidder's fault, 30% of the net purchase price must be paid. Electronic Invoicing: Must comply with EN 16931-1:2017 European standard Bid Submission and Document Access Requirements: Exclusively Designated Platform: EKR (Hungarian Electronic Procurement System) Bid Submission Address: Same as above (must be submitted electronically) Bid Language: Hungarian Electronic Catalogue: Not allowed Variant Solutions: Not allowed Multiple Bids: Not allowed Electronic Invoicing: Mandatory Electronic Ordering: No Electronic Payment: Yes Technical Specification Sheet Completion: Must fill in column H (for rows where column G is not empty) in each worksheet of the Excel file "Műszaki specifikáció" in the tender documents, as part of the technical proposal. Manufacturer Data Sheet: For parameters marked "A" in column A of the technical specification sheet, must attach the manufacturer's or dealer's data sheet (foreign language must have Hungarian translation). Exclusion Clauses: Basis: Hungarian Public Procurement Act (Kbt.) Article 62 Exclusion Situations: Participation in criminal organization, corruption, fraud, terrorism, money laundering, child labour, overdue taxes/social security, bankruptcy, liquidation, conflict of interest, provision of false information, etc. Russia-related Sanctions: According to EU Council Regulation 833/2014 (as amended by 2022/576), prohibits awarding contracts to sanctioned Russian-related entities. Bidders must submit relevant declarations. Review and Appeal Authority: Review Authority: Közbeszerzési Hatóság Közbeszerzési Döntőbizottság (Hungarian Public Procurement Authority Arbitration Committee) Registration Number: EKRSZ_40664534_2 Address: Riadó u. 5, Postal Code: 1026 Contact Email: dontobizottsag@kt.hu Contact Phone: +36 1 8828592 Appeal Time Limit: According to Hungarian Public Procurement Act Article 148. Notice Publication Information: Official Language: Hungarian TED eSender: Közbeszerzési Hatóság (Hungarian Public Procurement Authority) Core Business Decision Tips: Project Status: In progress, bids acceptable. Bid submission deadline is 30 March 2026 11:00, currently (27 February 2026) approximately 31 days of preparation time remain, which is relatively sufficient. Project Opportunity: Hungarian waste management municipal association procuring 4 types of heavy machinery (agricultural machine, loaders, wheeled excavator, work buckets), contract divided into 4 independent lots. Bidders can choose to bid on single or multiple lots based on their business scope. Lot Selection Suggestions: LOT-0003 (18-ton wheeled excavator) and LOT-0002 (loaders) have higher value, suitable for main construction machinery suppliers; LOT-0004 (work buckets) are specialized attachments, suitable for bucket manufacturers or professional attachment suppliers; LOT-0001 (agricultural machine) has clear technical requirements, suitable for agricultural machinery dealers. Evaluation Model: Price accounts for 80%, quality (warranty period extension) accounts for 20%. On the basis of price competition, promising longer warranty periods (max +24 months) and operating time warranties (max +2000 hours) can earn extra points. Bidders need to balance quotation with warranty commitments. Clear Qualification Threshold: Each lot has specific performance requirements, requiring proof of supply of at least 1 relevant piece of equipment completed within the past 6 years. This is a hard threshold; those not meeting it cannot bid. Strict Financial Conditions: No advance payment, requires financing the purchase; One-time payment, invoice issued after delivery and acceptance; High penalty fees (1% per day, max 20%) and breach of contract compensation (30%), placing extremely high demands on supplier performance capability. Language and Platform: All bid documents must be in Hungarian; all operations must be completed on the EKR system. Non-Hungarian enterprises need to prepare professional Hungarian translation in advance and familiarize themselves with the platform operations. Technical Document Requirements: Must carefully complete the technical specification sheet (Excel), and for parameters marked "A", attach the manufacturer's data sheet (foreign language requires Hungarian translation). Strict New Equipment Definition: Equipment operating time ≤15 hours, production year ≥2025. Must be explicitly committed to in the bid documents and corresponding proof provided. Recommended Next Steps: Download Tender Documents Immediately: Obtain the complete document package from the EKR platform, focusing on studying the technical specification sheet, draft contract, ESPD requirements. Assess Qualifications: Check if there are past performances meeting the requirements, prepare reference certificates. Calculate Quotation and Warranty Commitments: Balance price competitiveness with warranty period extension commitments, calculate the optimal scoring combination. Prepare Hungarian Bid Documents: Including technical specification sheet, manufacturer data sheets, ESPD, quotation form, etc. Submit Bid: Complete bid document upload via the EKR platform before 30 March. |
||||||||||||||||||||||||||||||||||||||||||||||||||
| Files |