ACREP to Start Exploration in Angola’s Cabinda Norte Block In 2025
2024-12-26 10:38
Favorite
Wedoany.com Report-Dec 26, Angolan upstream firm ACREP plans to begin oil exploration in the onshore Cabinda Norte Block in Angola in 2025. The aim is to identify and unlock the economic viability of the block.
ACREP will conduct feasibility studies to evaluate the potential production capacity of the block post exploration.
Up to 20 wells have been previously drilled at the block since 1968, with bureaucratic challenges delaying their development.
ACREP’s Operations Director Idónio dos Santos said that these challenges have been addressed and the requisite roads and infrastructure re-opened.
Related Products
Negotiable
Bi-directional Metal Hard Seal Ball Valve
Henan Quanshun Flow Control Science & Technology Co., Ltd.
Negotiable
Digital Multifunctional Electrical Measuring Instrument
Shanghai Complee Instrument Co.,Ltd.
Negotiable
YBX3 Series (Frame Number 355-630) High-Efficiency Explosion-Proof Three-Phase Asynchronous Motor
Jiamusi Electric Machine Co., Ltd.
Related Recommendations

California aviation fuel inventories drop to 2.6 million barrels
2026-04-28

Newfoundland Approves Cenovus White Rose Oil Field Expansion, Emissions to Increase by 21%
2026-04-28

Egypt Plans to Build Oil Storage Facilities in Alexandria
2026-04-28

Algeria's 2026 Tender for 24 Oil and Gas Blocks
2026-04-27

Bermuda's Seadrill Secures Two Gulf of Mexico Drilling Contracts, Adding Approximately $260 Million in Backlog
2026-04-23

Well-Safe Secures Decommissioning Contract for Forties Field in the UK
2026-04-23

Ukraine to Resume Oil Flow via Friendship Pipeline on April 22; First Batch Allocated to Hungary and Slovakia
2026-04-23

Sable Offshore's Third Oil Platform Off California to Begin Production in June
2026-04-21

TGS U.S. Gulf of Mexico Ocean Bottom Node Seismic Contract Secures Three-Year Extension
2026-04-21

Sable Offshore USA Resumes Operations of California Santa Ynez Pipeline, Plans to Increase Production to New Platform by 2026
2026-04-21
Lastest Bulletin
1
Key Section of Huangwu Tunnel for Shaanxi's Han-to-Wei River Water Diversion Phase II Project Breaks Through
2
UK's Hexagon Releases New Edgecam to Accelerate CNC Programming Verification
3
Australia's Xefco Deploys First Commercial Waterless Textile Dyeing System in Indonesia
4
Main Structure of Building 3 in Kunming Classic Twin Cities Construction Project in Yunnan, China, Topped Out
5
WestJet to Launch 8 New European Routes in Summer 2026
6
U.S.-based Aeva Sensor Powers Deployment of Nikon's New LiDAR System in the U.S. and Japan
7
Altera Releases New AI Software to Accelerate Edge AI Deployment
8
China's CSCEC Steel Structure Completes Main Steel Structure Topping Out of Habtoor Tower in Dubai, UAE
9
Germany's DyeMansion Launches Compact Industrial Processing System
10
Stratasys and Japan's Shin-Etsu Launch Medical-Grade 3D Printing Silicone
