en.Wedoany.com Reported - German wind turbine manufacturer BRAUN Windturbinen encountered a phase connection error at the property connection point during the installation of an Antaris wind turbine in Saxony. The company and the customer jointly identified and confirmed the cause of the fault, and ultimately completed the repair.
This Antaris wind turbine operates in a three-phase grid-connected mode, paired with a FIMER PVS 15 inverter and equipped with a "Made in Germany" CK18 generator with a rated power of 18 kW. This model supports safety features such as remote monitoring, remote shutdown, SPS-Wind, V-DC monitoring, and helicopter mode.
According to Saxony's simplified building regulations, since the structural engineer is registered with the Engineers' Association, no additional structural analysis is required for this installation process.

After the repair, the wind turbine has resumed normal operation. Saxony's relevant regulations simplify structural installation projects involving registered engineers, which facilitates the installation process of the Antaris wind turbine. BRAUN Windturbinen stated that it will continue to maintain the process of fault troubleshooting and customer collaboration in wind turbine installations. The Antaris wind turbine, as a medium-sized model in the company's product line, has accumulated operational experience in installation projects across Germany.
This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com









