China Railway Group Participates in Construction of Northeast China's Largest-Span Concrete-Filled Steel Tube Arch Bridge, Completing Main Arch Closure

2026-11-20 10:29
Favorite

en.Wedoany.com Reported - On November 16, the last arch rib segment of the Xiaohuanggou Jiangkou Grand Bridge on the Lagushao to Hunjiangkou section of National Highway G331 in Kuandian Manchu Autonomous County, Dandong City, Liaoning Province, was lifted into place, achieving closure of the main arch rib. The bridge has a total length of 442.25 meters and a main span of 352 meters. It adopts a half-through concrete-filled steel tube arch bridge structure and is the largest-span concrete-filled steel tube arch bridge in Northeast China, as well as a controlling project on this section of National Highway G331. China Railway Industrial, a subsidiary of China Railway Group, participated in the project construction.

The bridge is located in Kuandian Manchu Autonomous County, Dandong City, Liaoning Province. The bridge has a total width of 8.5 meters. The main bridge adopts a half-through basket-type concrete-filled steel tube arch bridge structure, and the deck system uses a longitudinal and transverse grid girder steel-concrete composite structure. The main arch rib consists of 44 segments, installed segment by segment through high-altitude cantilever assembly. Each arch rib adopts a four-chord truss section, with a section height of 6.3 meters and a width of 2.8 meters, composed of 4 large-diameter steel tubes filled with C50 self-compacting micro-expansion concrete.

The construction difficulties of this bridge are concentrated in the spatial alignment control of the large-span arch rib and high-altitude segment assembly. The project is located in a border mountainous area with strong valley winds and a narrow construction site. Temperature changes, wind loads, and structural dead weight all affect the arch rib posture and closure accuracy. The project team adopted digital construction management, implementing full-process data control from steel tube manufacturing, ground assembly, segment transportation to on-site matching.

During construction, the team used 3D modeling and spatial posture simulation technology to carry out refined setting-out of arch rib segments. Through structural force calculations and construction condition simulation, they analyzed the effects of temperature, wind loads, and dead weight on arch rib deformation, optimized the pre-camber settings and lifting scheme in advance, controlled the docking accuracy of each segment, and ultimately completed the closure of the main arch rib.

The bridge is an important component of the Lagushao to Hunjiangkou section of National Highway G331. The newly built road on this section has a total length of 55.6 kilometers, starting from Lagushao Village, Changdian Town, Kuandian Manchu Autonomous County, Dandong City, and ending at Xijiang Village, Zhenjiang Town, connecting to the border road network in Jilin Province. China Railway Jiujiang Bridge undertook the factory manufacturing, on-site assembly, and bridge site welding of approximately 7,445 tons of steel girders for two bridges: the Xiaohuanggou Jiangkou Grand Bridge and the Dajiucai Jiangkou Grand Bridge.

After the closure of the main arch rib, the bridge still needs to advance the concrete construction inside the arch rib, the deck system, and ancillary structures. Once the Lagushao to Hunjiangkou section is completed, it will open up an important breakpoint in the Dandong border highway, improve the traffic conditions of villages and towns along the route that rely on ferries and detours on winding mountain roads, and connect the border transportation and tourism resources along the Yalu River.

This bulletin is compiled and reposted from information of global Internet and strategic partners, aiming to provide communication for readers. If there is any infringement or other issues, please inform us in time. We will make modifications or deletions accordingly. Unauthorized reproduction of this article is strictly prohibited. Email: news@wedoany.com