en.Wedoany.com Reported - Construction is underway for an eight-story apartment building project at 930 Irwin Street in San Rafael, Marin County, California. The project is jointly developed by Mill Creek Residential and Seagull Principal Real Estate Fund. The construction team is currently advancing the groundwork for the 210-unit residential development named Modera San Rafael, currently in the foundation construction phase.

The project occupies a 0.92-acre site at the intersection of Irwin Street and Fourth Street, just one block from the U.S. Route 101 overpass. Demolition of the two existing office buildings began in November 2025. The entire construction project is expected to take approximately two years.
Upon completion, the building will stand 85 feet tall with a total floor area of approximately 288,320 square feet. This includes 203,200 square feet of residential space and an 85,090-square-foot, three-level parking garage. The unit mix comprises 44 studios, 70 one-bedroom units, 67 two-bedroom units, and 29 three-bedroom units. Parking facilities will include 222 car spaces and 342 bicycle spaces.
Stackhouse De la Peña Trachtenberg Architects is responsible for the architectural design. The exterior facade will feature a combination of stucco and painted vertical siding. The podium-style structure plans include a courtyard on the fourth floor, equipped with a small pool and outdoor seating, as well as an eighth-floor terrace connected to a community room. The ground floor will feature a club room, yoga studio, fitness center, and a coffee bar connected to the lobby at the corner of Irwin and Fourth Streets.
The project application was submitted in the summer of 2024 and received final approval in May of last year. Upon completion, residents will live just two blocks away from the city's approved proposal for a 17-story apartment building at 700 Irwin Street.
This construction project will increase residential density in the downtown San Rafael area and provide new housing and amenities for the community. The construction team must coordinate design and construction according to the plan to ensure completion and delivery within the two-year timeframe.
This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com









