en.Wedoany.com Reported - On April 23, the Luohe Million Project Department of China Energy Construction Group organized a summer three-prevention emergency drill. Project leaders, safety, quality, and logistics personnel, safety officers from subcontractors, as well as relevant staff from the owner and general contractor, participated together, using scenario-based drills to strengthen the safety production line.
Before the drill, a special briefing meeting was held in the project department conference room, clarifying the drill's purpose, procedures, division of responsibilities, and emergency response key points, ensuring all participants clearly understood their roles and tasks to prevent the drill from being merely perfunctory. After the briefing, all personnel proceeded to an open area in front of Unit 7's boiler for the on-site drill. The drill simulated a heavy rainfall waterlogging incident. Upon the commander issuing the emergency order, each team quickly responded: The security team immediately set up cordons and delineated hazardous areas; the response team swiftly laid drainage hoses and carried out water diversion; site command, personnel control, and logistical support were seamlessly connected and executed smoothly. Participants performed their duties and operated in a standardized manner, fully demonstrating the project department's efficient emergency response and coordinated handling capabilities. After the drill, project leaders conducted a review and summary, emphasizing that drills are not performances; only practicality ensures effectiveness in real combat. They stressed that all personnel should convert the procedures and skills mastered during the drill into actual handling capabilities, maintaining heightened vigilance during critical periods such as flood season and high temperatures, ensuring rapid response and timely action to effectively safeguard the project's construction safety.
This drill effectively tested the practicality and operability of the project department's summer three-prevention emergency plan, enhanced the emergency coordination capabilities of various positions, and laid a solid barrier for the project to safely navigate the summer and promote continuous and stable safety production.
This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com










