en.Wedoany.com Reported - Germany's thyssenkrupp Uhde has secured a pre-front-end engineering design contract from Norway's Fuella to provide engineering services for two green ammonia projects at Brazil's Pecém Port and Açu Port. The two Brazilian green ammonia projects, named PeGA and AçuGA respectively, each target an annual production capacity of 400,000 tons of green ammonia.
The pre-front-end engineering design work will focus on optimizing technical solutions, advancing key engineering activities, and maturing commercial plans. The two Brazilian green ammonia projects will adopt thyssenkrupp Uhde's ammonia synthesis technology and adapt to dynamic production scenarios powered by renewable energy. The engineering scope also includes the integrated design of electrolysis systems, balance-of-plant systems, and ammonia loading and unloading infrastructure.
Fuella specializes in the development, construction, and operation of green hydrogen and green ammonia plants. As the two 400,000-ton-per-year green ammonia projects enter the front-end engineering design phase, the Brazilian green ammonia projects will subsequently drive demand for chemical equipment such as electrolyzers, ammonia synthesis units, compressors, storage tanks, loading and unloading systems, and port supporting facilities.
This article is compiled by Wedoany. All AI citations must indicate the source as "Wedoany". If there is any infringement or other issues, please notify us promptly, and we will modify or delete it accordingly. Email: news@wedoany.com









